Join the Shiloh alumni in repairing our 50 year old pool

We need your help to keep the pool open as a place for traditions of night swims, pirate nights, weekend games and swim lessons to continue. Over the past few years the pool has been closed as much as it is open during camp, and if we don't repair the pool it can't be used next year.

Donation Form


Powered by Causeview

See the timeline of our 3 phase project below, and check back for updates and pictures of our progress.

Complete the donation form to partner with us.

The quantity of each 'ticket' you purchase helps us to reach our goal of 250 donors and $50,000.

If you want to donate a different amount than what is available, you can mix and match your 'tickets'. EX: For $50 put a 2 in the quantity box next to the $25. For $250 you can get 1 $200 and 2 $25. Then verify the amount in the "Total" is correct.


 
 

The Goal

$50,000
from 250 Alumni & FriendS


PLEDGED

 $17,500
as of
10/12/16

 
 
 
 
 

THE PLAN

PHASE I—COMPLETE Local engineer and code enforcement review and approve that plans meet safety standards. Construct road for hauling equipment and material. Excavation of concrete pool perimeter to evaluate additional repairs. Excavation of pool equipment room and all pool walls to floor level.

PHASE I—COMPLETE

Local engineer and code enforcement review and approve that plans meet safety standards.

Construct road for hauling equipment and material.

Excavation of concrete pool perimeter to evaluate additional repairs.

Excavation of pool equipment room and all pool walls to floor level.

PHASE II—COMPLETE   Install steel wall at deep end Build and install 8 new steel skimmer structures Plumbing of new return lines and skimmer lines around the entire perimeter Construct concrete Pool Room/storm shelter Place drainage lines for ground water around entire perimeter Backfill walls with material for long term maintenance

PHASE II—COMPLETE
 

Install steel wall at deep end

Build and install 8 new steel skimmer structures

Plumbing of new return lines and skimmer lines around the entire perimeter

Construct concrete Pool Room/storm shelter

Place drainage lines for ground water around entire perimeter

Backfill walls with material for long term maintenance

PHASE III – SPRING 2017(In progress) Repair camper/staff changing rooms Purchase and install pool room equipment Fill concrete pool deck around perimeter Install ladder  

PHASE III – SPRING 2017(In progress)

Repair camper/staff changing rooms

Purchase and install pool room equipment

Fill concrete pool deck around perimeter

Install ladder

 

Your gift gives campers a place to see they are safe, capable, and loved.